How often should a hydrographic office resurvey a shifting sandbar?

There's no single number in any manual that says "resurvey this bar every X months." Anyone who tells you otherwise hasn't planned a program for an inlet that moves. The interval depends on how much energy is working the sand, and how much risk you're willing to carry on the chart in between.
What drives the interval
A few things push a bar fast enough that last year's sounding stops being trustworthy:
Tidal prism and current strength at the inlet throat matter more than almost anything else. A high-energy tidal inlet can shift its deepest channel by tens of meters in a single spring-neap cycle. A sheltered estuarine bar with weak flushing might barely move for years.
Storm frequency and river discharge are the other big levers. One nor'easter or one flood pulse can rework a bar more than a full ordinary season. If your area of interest has seen a named storm, a sustained high-discharge event, or heavy ice-out flow since the last sounding, treat the chart as provisional regardless of how recently it was surveyed.
Dredging and inlet maintenance work changes the baseline too. A bar that was cut last winter isn't the same bar this summer. Any office running a maintained channel already knows this, it's why those reaches often get surveyed more than once a year while a nearby undisturbed shoal goes five years between visits.
IHO S-44 gives you the order and zone-of-confidence framework for how good a survey needs to be once you run it, but it doesn't hand you a resurvey clock. That's a local decision, built on local sediment behavior, and it's usually the survey planner, not a standard, who ends up defending it to the harbor board.
A practical way to set the schedule
Most offices land somewhere close to this, tuned to their own waters:
- High-energy inlets and actively dredged bars: annual to semiannual full resurvey, with interim checks on the channel axis after major storms.
- Moderate-energy bars in estuaries or river mouths: every one to three years, shortened whenever a flood event or unusual tide cycle is logged.
- Low-energy or armored shoals: three to five years, unless a specific complaint, grounding, or aerial photo flags movement.
The gap in all three tiers is the same: between full vessel surveys, nobody is watching the bar. A chart note from three years ago doesn't tell you whether this year's sandbar has crept fifty meters toward the channel or sat still. That's the window where boats run aground on features that used to be two meters deeper, and where a survey launch gets sent out to re-sound a bar that hasn't moved, burning a day the office didn't have to spare.
An annual satellite pass that estimates shallow-water depth from the water's optical signature won't replace the lead line or the multibeam head you'd still run before publishing a new chart edition. What it does is give you a yearly look at how the bar's shape and shoaling are trending, so the resurvey gets scheduled because the sand actually moved, not because the calendar said five years was up. Satellite Bathymetry builds that annual depth estimate layer for an area of interest, aimed at exactly this gap between full hydrographic surveys.
When to shorten the interval regardless of schedule
A few triggers should override whatever rotation you've set:
A reported grounding or a pilot's note that soundings don't match the chart. A storm or flood event strong enough to be a once-in-a-decade entry in the log. Visible channel migration in aerial or satellite imagery compared with the last survey. Any dredging or inlet-stabilization project nearby that changes sediment supply.
None of these need a full resurvey cycle to justify action. They need a planner willing to move the bar back up the queue.
If you're staring at a charted shoal you haven't resurveyed since before the last two storm seasons, an annual depth layer is a reasonable way to decide whether this is the year it finally needs a boat.